Curdworth Bottom Lock Mooring

The problem is caused by the nearby Canal Pond overflowing after periods of heavy rain. This erodes the lock moorings below. This has happened 3 times now in 18months. As well as damaging the moorings it’s filling the canal with silt!  Just a few well placed sand bags would be a short term fix, but with no lengthsmen who will install them? Penny wise, pound foolish again.

Leave a Reply